| 18 Sep 2026 | Interview invitations drafted for 13 people across the 9 teams, by role: 20 to 30 minutes each, what it is for (the recurring work, not anyone's performance) and a request to bring a rough list of last week's work Roles sheet; the interview guide | Draft | Managing Director Approved with changes | The MD added one line on why (time back for the team, said only because it is true) and sent all 13 on Mon 21 Sep. |
| 24 Sep 2026 | One reminder drafted for the 2 people with no reply after 3 working days Replies logged against the invitations; Inputs (3 working days) | Draft | Managing Director Approved | Sent on 24 Sep. One booked; the warehouse operative preferred not to be interviewed, so picking was observed instead. |
| 9 Oct 2026 | 12 interviews held 29 Sep to 9 Oct, none recorded: the consultant's notes filed in the restricted folder within the day; read-back of each person's task list drafted for the consultant to send Interview log; Inputs (recorded: No) | Logged | The consultant Decided | Every read-back sent within a working day; two people corrected a time. |
| 9 Oct 2026 | 27 task rows drafted from the notes: task, team, role, people, times a month, minutes and where they came from, with each person's own answers to the five task questions quoted beside the row. No AI pattern, Lean view, returns, tool or score The consultant's notes; observation notes for 5 tasks | Coded | The consultant Approved with changes | The consultant merged two rows into one (chasing overdue invoices was raised by two people), leaving 26, and chose every pattern and answer in the working session with the MD. |
| 9 Oct 2026 | Three tasks with rough times: time-log requests drafted for the people to time the next three occurrences (order status questions, supplier invoices, returns and credit notes) Interview notes (times given as a range) | Draft | The consultant Approved | Timings back by 16 Oct; the three rows now show Time log as their source. |
| 12 Oct 2026 | Three tasks raised only by the MD (product descriptions, supplier research, job adverts) rest on the owner's estimate: 3 of 26, under the 30% limit Task register (where the data came from) | Flag | The consultant Decided | Kept as Owner estimate and named in the map's confidence note. |
| 12 Oct 2026 | Sickness absence records hold health data (special category): Data involved left for the consultant to set; notes describe the data by type and role only Interview notes | Flag | Managing Director Decided | Set to Special category: Controls first, with credit checks and complaint reports. Advice before any AI use. |
| 26 Oct 2026 | Reminders drafted for the two pilot owners to measure their three baselines before the pilots start on 2 Nov Pilots sheet (baseline, owner); Inputs (start date) | Draft | Managing Director Approved | Sent on 26 Oct. The MD's inbox log and the questionnaire timings were ready on 2 Nov. |
| 2 Nov 2026 | Quotation baseline not complete at the start: 12 of the 20 quotations timed Internal Sales lead's baseline sheet | Flag | Managing Director Decided | The quotation pilot started a week later, on 9 Nov, once all 20 were timed. The other two started on 2 Nov. |
| 11 Jan 2027 | Re-run prepared: each pilot's measured time beside its baseline and the assumed pattern share, in a working copy, for the MD to decide whether to replace the shares on Patterns The pilot owners' logs; Pilots sheet; Inputs (start date, 14 days) | Draft | Managing Director Pending | |