Chilled soups, sauces and ready meals for foodservice wholesalers, contract caterers and retailers' own-label, cooked in Brighouse and packed and despatched from Elland. 118 staff on two sites.
Verdict: The plan covers 8 scenarios; all are complete (owner, deadline map, legal deadlines, approved holding statement, spokesperson). Every legal deadline that applies is on the map (8), and every one of the 13 roles has a deputy. 53 of 53 different phone numbers have been checked in the last 6 months (at the start, 7 of 29). In the baseline exercise the first approved holding statement came at minute 52 against a target of 30, and 1 of 6 injects were actioned on time. The rehearsal with the plan is on 19 Nov 2026. How the value is shown (risk avoided, not a forecast): the largest event, “Key customer goes into administration”, would cost £632,750 from the owner's own figures. With the owner's assumed likelihoods, the 8 events cost £67,959 a year on average; if the plan works as assumed it cuts that by £21,169 (£10,584 if half as well), against £4,306 a year to keep up with the build spread over 5 years. Re-measure the numbers and the quiz on 16 Apr 2027.
| Scenario | Owner | Rows | Legal | First to tell | Complete |
|---|---|---|---|---|---|
| S1 Allergen or foreign-body recall Product recall · Both sites | Technical lead speaks: Crisis lead | 5 | 1 | Local authority food safety team straight away | Yes |
| S2 Serious injury on the production line Serious accident · Brighouse kitchen | Health and safety lead speaks: Crisis lead | 6 | 2 | Emergency services (999) straight away | Yes |
| S3 Fire at the Brighouse kitchen Fire or flood · Brighouse kitchen | Operations lead speaks: Crisis lead | 7 | 1 | Fire and rescue service (999) straight away | Yes |
| S4 Ransomware or a data breach Data breach · Both sites | IT and data lead speaks: Crisis lead | 6 | 2 | Insurer: cyber policy incident line 1 hour | Yes |
| S5 Viral complaint or video on social media Viral complaint · Both sites | Communications lead speaks: Communications lead | 3 | 0 | Crisis lead 1 hour | Yes |
| S6 Key customer goes into administration Key customer failure · Both sites | Finance lead speaks: Crisis lead | 5 | 0 | Credit insurer: overdue account notice 24 hours | Yes |
| S7 Chiller or power failure at Elland Site loss or utility failure · Elland packing and despatch | Site lead (Elland) speaks: Customer lead | 3 | 0 | Refrigeration maintenance contractor straight away | Yes |
| S8 Effluent or ammonia spill Pollution · Brighouse kitchen | Health and safety lead speaks: Crisis lead | 5 | 2 | Environment Agency incident hotline straight away | Yes |
| Scenario | Who must be told, and what the law says | Latest | Told by |
|---|---|---|---|
| Allergen or foreign-body recall | Local authority food safety team Food: withdraw unsafe food immediately and immediately inform the competent authorities; recall from consumers if it has reached them. You can also tell the FSA yourself once it has reached consumers (you must if FSA-approved) | straight away | Technical lead |
| Serious injury on the production line | HSE: specified injury (RIDDOR) Notify without delay (phone 0345 300 9923 for deaths and specified injuries, or online); the report must be received within 10 days | straight away | Health and safety lead |
| Serious injury on the production line | HSE: if off work more than seven days (RIDDOR) Report within 15 days of the incident, online | 15 days | Health and safety lead |
| Fire at the Brighouse kitchen | HSE: dangerous occurrence (RIDDOR), if work stops for more than 24 hours Notify without delay, online; the report must be received within 10 days | straight away | Health and safety lead |
| Ransomware or a data breach | Information Commissioner's Office Report a notifiable breach without undue delay and not later than 72 hours after becoming aware of it; record every breach, reported or not | 3 days | IT and data lead |
| Ransomware or a data breach | People affected, if the risk to them is high Tell them directly and without undue delay | 3 days | People lead |
| Effluent or ammonia spill | Environment Agency incident hotline Report a pollution incident straight away; an environmental permit or consent usually requires notice without delay (check yours) | straight away | Health and safety lead |
| Effluent or ammonia spill | HSE: dangerous occurrence (RIDDOR), an escape that could injure someone Notify without delay, online; the report must be received within 10 days | straight away | Health and safety lead |
The rest of the map is the business’s own rules and its policies’ and contracts’ deadlines (the insurers’, the bank’s, the co-packer’s), as the owner read them.
| Role | Holds it | Deputy | Can approve | Can speak |
|---|---|---|---|---|
| Crisis lead | Helen M | Rob D | Yes | Yes |
| Spokesperson | Helen M | Gareth L | Yes | Yes |
| Operations lead | Rob D | Sanjay P | Yes | Yes |
| Technical lead | Aisha K | Marta W | No | No |
| Communications lead | Leanne F | Amy C | No | Yes |
| Customer lead | Gareth L | Nina V | No | Yes |
| People lead | Priya S | Claire B | No | No |
| Finance lead | Martin O | Claire B | No | No |
| IT and data lead | Owen R | Tom G (IT support firm, on contract) | No | No |
| Health and safety lead | Dave N | Sanjay P | No | No |
| Site lead (Elland) | Kerry J | Dan H | No | No |
| Log-keeper | Josh T | Marta W | No | No |
| Legal adviser | Retained solicitor (partner) | Retained solicitor (associate) | No | No |
Mobile and out-of-hours numbers are in the workbook and the printed contact sheet only.
Likely triggers. A customer's technical team or a consumer reports an undeclared allergen or a foreign body; QA finds a label or recipe mix-up; a supplier recalls an ingredient
The first hour. Stop despatch of the batch and quarantine stock; trace every pack from the despatch records; call the customers' technical teams; tell the local authority food safety team; start the log
| Who must be told | Kind | By | Told by, and how |
|---|---|---|---|
| Local authority food safety team | Legal | straight away | Technical lead Phone the duty officer, then the online report |
| Food Standards Agency incidents team, if the product has reached consumers | Our rule | straight away | Technical lead Online incident report, then phone |
| Customers' technical teams (affected batches) | Our rule | 2 hours | Technical lead Phone, then email with batch codes |
| All staff | Our rule | 4 hours | People lead Briefing at the shift change and text alert |
| Insurer: product recall policy | Policy or contract | 24 hours | Finance lead 24-hour incident line |
Holding statement (approved by the crisis lead, 14 October 2026; 96 words):
We have found that [product], batch [code], may contain [allergen or foreign body] not shown on the label. As a precaution we have stopped supplying it and are removing it from sale. If you have an allergy to [allergen], do not eat it. If you bought it in a shop, return it there for a full refund; caterers and food service customers, please stop serving it, keep it to one side and call us on [number] to arrange collection. We are working with the local authority food safety team. We will update this statement by [time].
Staff message, sent first:
We are withdrawing [product], batch [code]. Stop packing and despatching it now and move all stock to quarantine. Don't discuss this outside work or online; refer any questions to Leanne F. Update at [time].
Spokesperson: Crisis lead. Channels: Customers' technical teams by phone, then email; notice on the website; social media replies only to direct questions.
| Minute | Inject and expected action | Target | Actual | Result |
|---|---|---|---|---|
| 0 | A customer's technical manager rings: a consumer reports a reaction to the chicken and mushroom soup; the label shows no celery Expected: Technical lead takes the details, quarantines the batch and calls the crisis lead | 10 | 9 | On time |
| 10 | QA finds the stock pot with celery was used on that batch; 1,900 packs are in three customers' depots Expected: Decide to withdraw; trace every pack from despatch records | 20 | 31 | Late |
| 20 | A regional radio newsdesk calls reception asking about a recall Expected: Reception refers the call to the communications lead, who gives the holding line | 25 | – | Not done |
| 30 | A photo of the pack is shared 400 times on social media Expected: Holding statement posted as one reply; monitoring started | 40 | 52 | Late |
| 40 | The local authority food safety officer asks what has been done so far Expected: Technical lead reports the actions and the recall plan | 45 | – | Not done |
| 50 | Two customers ask for a written update Expected: Customer lead sends an approved update | 55 | 58 | Late |
| What we learned | Action | Status |
|---|---|---|
| Nobody knew the local authority must be told immediately | Deadline map on every scenario page; deadlines quiz for the team Technical lead, by 14 Oct | Done |
| Reception told the radio newsdesk 'no comment' | Brief reception and the switchboard: one line and the communications lead's number Communications lead, by 23 Oct | Open |
| The statement was drafted from scratch by four people and approved at minute 52 | Pre-approved holding statement for each scenario Communications lead, by 14 Oct | Done |
| Two numbers on the old contact list were dead, one of them the insurer's claims line | Check every number, deputies included, every six months Log-keeper, by 15 Oct | Done |
| No one recorded decisions or times | A log-keeper with a deputy; the log form in the plan Crisis lead, by 14 Oct | Done |
| The customer lead was on holiday and nobody covered | A deputy for every role Crisis lead, by 14 Oct | Done |
Without the plan With the plan (the owner's assumption)
| Scenario | Cost without the plan | With the plan | Reduction | Likelihood (assumed) | Expected cost a year | Break-even: once in N years (half as well) |
|---|---|---|---|---|---|---|
| Allergen or foreign-body recall direct costs estimated | £249,265 | £141,163 | £108,102 | 1 in 20 own history | £12,463 | 25 (13) |
| Serious injury on the production line direct costs estimated | £22,862 | £17,431 | £5,431 | 1 in 7 own history | £3,429 | 1 (1) |
| Fire at the Brighouse kitchen direct costs quotation | £269,536 | £182,802 | £86,734 | 1 in 100 insurer or adviser's view | £2,695 | 20 (10) |
| Ransomware or a data breach direct costs estimated | £59,312 | £26,725 | £32,587 | 1 in 10 insurer or adviser's view | £5,931 | 8 (4) |
| Viral complaint or video on social media direct costs quotation | £42,000 | £16,000 | £26,000 | 1 in 7 owner's judgement | £6,300 | 6 (3) |
| Key customer goes into administration direct costs counted | £632,750 | £540,500 | £92,250 | 1 in 20 owner's judgement | £31,638 | 21 (11) |
| Chiller or power failure at Elland direct costs counted | £23,104 | £14,052 | £9,052 | 1 in 5 own history | £4,621 | 2 (1) |
| Effluent or ammonia spill direct costs estimated | £44,052 | £19,052 | £25,000 | 1 in 50 owner's judgement | £881 | 6 (3) |
Each cost is lost gross profit (£18,104 a working day, counted from the accounts, times the days and share of output lost, less any business interruption cover), customers’ gross profit lost in the rest of the year after the days disrupted (from the sales ledger, less the insured share inside the 12-month indemnity period) and direct costs net of what the insurer would pay. The plan’s effect on days and customers, and how much less the insurer would pay without it (S6 and S8), are the owner’s assumptions. The break-even column needs no likelihood: the yearly cost (upkeep plus the build spread over five years) is covered if the plan saves its assumed amount on that event once in that many years. With the owner’s assumed likelihoods (not a forecast), the events cost £67,959 a year across 8 scenarios on average; if the plan works as assumed it cuts that by £21,169 a year; £10,584 if half as well. Cost in full: £6,288 to build; £3,048 a year to keep up (48 hours); £4,306 a year with the build spread over 5 years. The largest event, the key customer’s administration, the plan can barely touch: it protects only the credit insurance claim, and that only on the owner’s assumption about a missed overdue notice.
| Measure | At the start | Now | After the rehearsal | Re-measure |
|---|---|---|---|---|
| Different phone numbers checked in six months | 7 of 29 (24%) | 53 of 53 (100%) | – | 16 Apr 2027 |
| First approved holding statement in the exercise | minute 52 | – | target minute 30 | – |
| Injects actioned on time | 1 of 6 | – | to be logged | – |
| Deadlines quiz: answers right | 41% | – | the same people, same questions | 16 Apr 2027 |
One exercise and nine people: direction, not proof. The rehearsal plays a different scenario (S4) so the team can’t remember the answers.
The scenarios, deadlines, roles, statements and rules are as agreed with the owner and the crisis team on 16 Oct 2026. The legal deadlines are the rules on Inputs, checked on official sources on 16 October 2026; they are not legal advice, and each policy's or contract's own deadline is as the owner read it. Gross profit a working day is counted from the accounts and customers' gross profit from the sales ledger; direct costs and insurance are counted, estimated or quoted as each row says. Days disrupted, customers lost, how far the plan reduces them, and how much less the insurer would pay without the plan are the owner's estimates and assumptions, not tested; customers lost count for the rest of the year after the days disrupted, less the insured share inside the business interruption indemnity period; so is each event's likelihood a year, which is never a fact, so the expected costs hold only with those likelihoods. The readiness measures rest on one baseline exercise and a quiz of 9 people: they show direction, not proof.
The plan is finished when it is handed over and printed; the rehearsal is the first test of it. Check the numbers every six months, and rehearse once a year.