Error Proofing Design · October 2026

Merrowfield Controls Ltd

Electrical control panels built to order for machine builders and water companies. 34 staff. Scope: panel build: from kitting through wiring, testing and despatch.

Worked example. Merrowfield Controls and its figures are fictional. All figures come from the worked-example spreadsheet: ALL CHECKS PASSED (with 6 notes).
The headline

173 mistakes a year cost £28,140; 84% of it is mistakes the customer finds

Net saving
£19,512
a year, after £5,064 of running costs and time added; payback 7 months on £12,000
Found by customers
£23,658
a year: call-outs, snag visits, site rework
Best device
£5,537
a year on its own: clutch-set torque drivers
Still reaching customers
8 a year
down from 47

Verdict: 6 kinds of mistake, 173 a year, cost £28,140, 84% of it from mistakes the customer finds. The costliest: built to an old drawing revision (£10,752 a year). 7 devices should save £19,512 a year after £5,064 of running costs, including the time they add, for £12,000 one-off (payback 7 months), cutting mistakes that reach the customer from 47 to about 8 a year. 1 device doesn’t pay on its own: keep it only for a safety or customer reason; dropping it would make the net saving about £20,928 for £5,500 one-off. 2 of the mistakes are safety risks: not all are yet made impossible or stopped at the step.

The mistakes

The later a mistake is found, the more it costs

MistakeFound todayA yearCost a yearDevices removeSaving
Built to an old drawing revision
Kitting · counted
By the customer4£10,75294%£9,715
Terminal screw not torqued Safety
Wiring · counted
By the customer9£6,49895%£6,173
Wire markers missing or wrong
Wiring · counted
By the customer22£4,75295%£4,514
Wire landed on the wrong terminal
Wiring · counted
At final test or check96£2,59294%£2,319
Wrong breaker rating fitted Safety
Kitting · counted
At final test or check30£1,89060%£1,134
Loose parts or offcuts left in the panel
Despatch · estimated
By the customer12£1,65650%£720

A torque fault found on site costs £650 in travel and goodwill and four hours; the same fault prevented at the bench costs nothing. Wrong terminals are caught at final test today, so they cost hours of fault-finding but no cash.

The devices

Make it impossible first; stop it at the step second

Device or methodLevelOne-off; running a year with time addedOwn net saving a yearOwner and date
Clutch-set torque drivers for every bench, with a torque-mark pen line on each tightened screw
Stops: Terminal screw not torqued
Prevent: can't be done wrong
removes about 95%
£2,400
£636 a year
£5,537
payback 5 months
Workshop manager
13 Nov 2026 · Trial
Wire markers printed from the CAD wiring list, each showing its destination terminal
Stops: Wire landed on the wrong terminal
Prevent: warns before it happens
removes about 60%
£1,800
£400 a year
£4,524
payback 5 months
Design lead
11 Dec 2026 · Idea
Point-to-point continuity tester run against the CAD netlist before power-up
Stops: Wire landed on the wrong terminal
Detect: stops it at the step
removes about 85%
£6,500
£2,180 a year
−£1,416
doesn’t pay on its own
Test engineer
29 Jan 2027 · Idea
Wire markers printed from the CAD wiring list, each showing its destination terminal
Stops: Wire markers missing or wrong
Prevent: can't be done wrong
removes about 95%
£0
£0 a year
Same device as above: counted thereDesign lead
11 Dec 2026 · Idea
Kit trays laid out from the bill of materials, with each breaker's rating label facing up in a marked slot
Stops: Wrong breaker rating fitted
Prevent: warns before it happens
removes about 60%
£600
£840 a year
£294
payback 24 months
Stores lead
27 Nov 2026 · Idea
Drawings printed only from the job record, with the revision in a large box and old prints recalled
Stops: Built to an old drawing revision
Prevent: warns before it happens
removes about 60%
£0
£0 a year
£1,555
no one-off cost
Design lead
30 Oct 2026 · Trial
Shadow board for each panel's loose parts, and a magnetic sweep and photo before the doors close
Stops: Loose parts or offcuts left in the panel
Detect: warns at the step
removes about 50%
£300
£672 a year
£48
payback 75 months
Workshop manager
6 Nov 2026 · Idea
Kitting sheet printed from the job record carries the revision; the kitter scans the drawing barcode, which must match before kitting starts
Stops: Built to an old drawing revision
Detect: stops it at the step
removes about 85%
£400
£336 a year
£2,928
payback 2 months
Design lead
27 Nov 2026 · Idea

Each device is judged on what it adds on top of the others, after its running cost and the minutes it adds to every panel. Clutch-set torque drivers make an untightened screw impossible and pay back in about five months. The revision barcode check costs £400 and stops an old drawing at kitting: payback under two months. Printed wire markers serve two mistakes from one printer. The continuity tester is the one to drop or rethink: with the markers in place it adds about £764 a year but its ten minutes on every panel cost more than that, so it pays only if test time is cut elsewhere. The shadow board barely pays (£48 a year): keep it for the customer, not the money. The kit trays pay slowly, and a wrong breaker is a safety risk covered only by a warning: scanning each breaker against the bill of materials at kitting would stop it at the step, and is worth doing whatever the payback. Trial each device on a few panels before buying in bulk, and allow a few weeks before it reaches its full effect.

How confident are we?

What this rests on

Mistakes are counted over 12 months, from records where marked Counted, and priced from real cases: cash costs, plus overtime only for the share of hours that causes it. How much each device removes is an assumption by level (can’t be done wrong 95%, check later 30%), to be confirmed by a trial; devices of the same kind on one mistake are not added, and prevention and detection are combined, not added. Detection saves the cost of the mistake escaping, and saves hours only where it is quicker to put right at the step. Running costs, including the time each device adds to every job at the full hourly cost, are taken off. Better reputation, fewer lost customers and safety are not valued: a safety risk is treated by the Checks, not by the payback.

The months after

What the agent flagged, and what was decided

Fictional, continuing the example. After the design, Merrowfield chose the guided route and set up the agent in an AI assistant the business already uses, connected read-only to its test log, its customer complaints log and its service call-out records (its IT confirmed this before it committed). On the first Monday of each month it counts each mistake's escapes, updates the 12-month counts in a new dated copy of the workbook, runs the 15 checks, compares each mistake with what its devices should leave and each device with its due date, logs what it finds and sends the workshop manager a short note. Nothing left the business, and no decision changed, without one of its own people approving it: the agent never changed a device, a status or a drawing.

Monthly runs
3
2 November to 4 January 2027
Flags raised
3
the other findings went in the monthly note
Devices that had stopped working
3
each found within a month and put right within a week
Wrong terminals at final test
4
in December, from 8 a month before the markers
DateWhat the agent foundWhat people decided
2 Nov 2026
No flag
Drawing revision control in use; no panel built to an old revision sinceNone needed
2 Nov 2026
Flag
A loose-connection call-out (terminal screw not torqued), a safety risk, on a panel wired on 20 OctoberWired on the one bench still without a clutch driver during the trial; drivers fitted to every bench by 13 November, as planned
7 Dec 2026
No flag
Wrong breaker ratings at final test down after the kit trays; drawing barcode check in useNone needed
7 Dec 2026
Flag
Shadow board for loose parts more than your 14 days past its due date and not in useWorkshop manager to make the board this week; in use from 14 December
4 Jan 2027
Flag
Wire markers missing or wrong: 2 customer complaints on panels wired after the printed markers came in, a device meant to make it impossibleTwo late wiring changes were marked by hand. Rule: every change is reprinted from the CAD wiring list before it is wired
4 Jan 2027
No flag
Wire landed on the wrong terminal: fewer at final test since the printed markers, within your lineWatch January, the first full month with the markers

At the check-in on 26 November, after the first monthly run, Geoff and the managing director read the first log together and left both lines where they were. After that the agent, its accounts and its log were Merrowfield's.

Each flag pointed at a device that had stopped working, or never started: a bench without its clutch driver, a shadow board not made, and hand-written markers on late changes. Each was put right within a week. The counts are too few months in to confirm the saving the design expects; the continuity tester, due in January, is next. Reading the monthly note and recording decisions took the workshop manager about 20 minutes a month (estimate). The months after add nothing to the figures above.

Fictional and labelled: these events continue the worked example. The same six events are the sample rows in the Agent log of the worked-example spreadsheet. The agent is part of the guided and done-for-you routes; the self-implement kit does not include it.