Precision machined parts and small assemblies for food-machinery and pump makers. 40 staff; 5 areas, 31 people in the plan.
Verdict: 5 areas, 31 people. They score 6.2 of 25 on average today, weakest on sustain; the target is 17.6. People spend about 2,128 hours a year searching; cutting it, less the time new routines take, frees 749, of which 399 cut overtime (£13,156) and the rest is capacity, not money. 125 square metres are freed, not counted as money. After £1,822 a year of audits and materials, the net saving is £11,334 a year. 15 red-tagged items recover £6,500, against £10,166 of actions and disposal (payback 4 months).
| Area | Today: Sort to Sustain | Target | Score of 25 | Hours freed a year, after routines | Audit |
|---|---|---|---|---|---|
| Machine shop 12 people · 20 min a day searching (measured) | 11210 | 44433 | 5 → 18 | 230 230 cut overtime | Machine shop supervisor weekly, 30 min |
| Fitting and assembly 8 people · 15 min a day searching (measured) | 21210 | 44433 | 6 → 18 | 169 169 cut overtime | Assembly lead weekly, 30 min |
| Stores 3 people · 25 min a day searching (measured) | 12211 | 44433 | 7 → 18 | 144 0 cut overtime | Stores lead fortnightly, 30 min |
| Maintenance workshop 2 people · 30 min a day searching (estimated) | 11100 | 34333 | 3 → 16 | 115 0 cut overtime | Maintenance engineer fortnightly, 20 min |
| Office 6 people · 10 min a day searching (estimated) | 22321 | 44433 | 10 → 18 | 92 0 cut overtime | Office manager monthly, 20 min |
Every area gets a scored audit with an owner, a frequency and a time, posted on the area's board. The machine shop saves the most search time (460 hours a year), but its new daily five-minute clean takes back 230 of them; two-bin refilling takes 61 hours in assembly. Stores, maintenance and the office have no overtime to cut, so their savings are capacity. The 125 square metres freed aren't counted as money: Pellworth wasn't going to rent more space (£8,125 a year if it had been).
| Decision | Items | Recovered | Cost to dispose |
|---|---|---|---|
| Sell | 2 | £1,500 | £0 |
| Return to supplier | 2 | £2,350 | £0 |
| Use up (no reorder) | 2 | £2,300 | £0 |
| Move to stores | 1 | £0 | £0 |
| Scrap | 7 | £350 | £520 |
| Keep | 1 | £0 | £0 |
Recovered means cash actually received or not spent: a dealer's offer for the old tool holders, supplier credits for bar stock and seals, and reorders cancelled for inserts and duplicate stock. Items moved to stores or kept recover nothing.
| Area | S | Action | Cost; hours | Owner and date |
|---|---|---|---|---|
| Machine shop | Sort | Red-tag day with the whole team | £0 36 h | Machine shop supervisor 30 Oct 2026 |
| Machine shop | Set in order | Shadow boards and tool carts at each machine | £1,800 24 h | Machine shop supervisor 27 Nov 2026 |
| Machine shop | Set in order | Labelled locations for fixtures, by part number | £300 12 h | Machine shop supervisor 27 Nov 2026 |
| Machine shop | Shine | Daily five-minute clean with a checklist at each machine | £150 6 h | Machine shop supervisor 13 Nov 2026 |
| Machine shop | Standardise | Photo standard for each machine area | £0 6 h | Machine shop supervisor 11 Dec 2026 |
| Fitting and assembly | Sort | Red-tag day | £0 24 h | Assembly lead 30 Oct 2026 |
| Fitting and assembly | Set in order | Two-bin fastener racks at each bench | £900 10 h | Assembly lead 27 Nov 2026 |
| Fitting and assembly | Standardise | Bench layout standard with photos | £0 4 h | Assembly lead 11 Dec 2026 |
| Stores | Sort | Red-tag the racks; return or sell surplus | £0 18 h | Stores lead 6 Nov 2026 |
| Stores | Set in order | Location labels on every bay and bin; locations in the stock system | £600 30 h | Stores lead 11 Dec 2026 |
| Stores | Shine | Floor markings for walkways and pallet bays | £700 8 h | Stores lead 27 Nov 2026 |
| Maintenance workshop | Sort | Red-tag the workshop and spares cage | £0 8 h | Maintenance engineer 6 Nov 2026 |
| Maintenance workshop | Set in order | Spares labelled by machine; shadow board for tools | £400 10 h | Maintenance engineer 11 Dec 2026 |
| Office | Sort | Clear-desk morning; archive and shred | £0 12 h | Office manager 13 Nov 2026 |
| Office | Set in order | Shared-drive folders by customer and job | £0 10 h | Office manager 11 Dec 2026 |
The actions cost £4,850 and £4,796 of everyone's time; with £520 of disposal and £6,500 recovered, the net one-off cost is £3,666.
Search time is timed on a normal day where marked Measured; only part of it is assumed to go, and the time new routines take (daily cleans, refilling) is taken off. Hours saved count as money only up to the overtime or agency hours each area could cut, at the overtime rate; the rest is capacity. Freed space counts only if it avoids paying for more. Red-tag value is what will actually be received: a sale, a credit or a reorder not placed. Everyone’s time on the actions and audits is costed at the full hourly cost. Safety, morale and the visual control 5S gives every other improvement are real but not valued.
Fictional, continuing the example. After the plan, Pellworth chose the guided route and set up the agent in an AI assistant the business already uses, connected read-only to the folder where the audit owners record their scores and to the plan itself (its IT confirmed this before it committed). Every Monday it lists the week's audits from each area's frequency, reads last week's scores, compares each area with its target and its last audit against the lines the operations manager set on Inputs, logs what it finds and sends the operations manager a short note. Nothing left the business, and no decision changed, without one of its own people approving it: the agent never changed a score, a target or an audit date.
| Date | What the agent found | What people decided |
|---|---|---|
| 2 Nov 2026 No flag | Red-tag days held in the machine shop and assembly; first weekly audits scored | None needed |
| 16 Nov 2026 Flag | Maintenance workshop audit more than your 7 days overdue | The maintenance engineer was on a breakdown; audit done on 17 November. A stand-in auditor named for when he is on call-out |
| 7 Dec 2026 No flag | Machine shop reached its target | None needed |
| 14 Dec 2026 Flag | Stores audit down more than your 3 points since the last one | Walkways cleared that week; an overflow bay marked out for December deliveries |
| 11 Jan 2027 Flag | Machine shop more than your 2 points below its target after the Christmas shutdown | Tools found in lockers returned and boards restocked; daily clean restarted; re-audit on 15 January |
| 18 Jan 2027 No flag | Machine shop back at its target | None needed |
At the 30-day check-in in November, Geoff and the operations manager read the first log together and left all three lines where they were. After that the agent, its accounts and its log were Pellworth's.
Each flag was a slip the weekly audits would have shown anyway, but the agent put it in front of the operations manager the Monday it happened: a missed audit, a busy month in stores and the machine shop after the shutdown. Each was back on track within a week or two. Reading the weekly note and recording decisions took the operations manager about 10 minutes a week (estimate). The months after add nothing to the figures above.
Fictional and labelled: these events continue the worked example. The same six events are the sample rows in the Agent log of the worked-example spreadsheet. The agent is part of the guided and done-for-you routes; the self-implement kit does not include it.