Regional building contractor: design and build, refurbishment and fit-out for commercial, industrial, education and health clients across Lincolnshire and the East Midlands, from an office in Lincoln. 78 staff.
Verdict: The brief specifies 20 pages at launch, each with one purpose and one main action that serves its goal; 6 key pages have a complete spec and wireframe. All 17 old addresses with traffic or links redirect to a page live at launch; 5 keep their address and are left off the redirects map. Copy is drafted for 3 pages, every claim on usable proof; 1 proof point is on hold and kept out of the copy. Every required form field is needed to reply. 26 developer requirements are ready for the quotation request, covering every area needed. It feeds 4 catalogue ROI products: 7 of 7 needs are ready once the handover checks pass; 1 is a weak fit. Main measure: form completion on the quotation page, 26% now, can only show direction by the re-measure; enquiries per 1,000 sessions on the key enquiry pages, 7.2 now, can only show direction. Measure again on 1 Sep 2027 (early read 30 May 2027).
Redirects to a key enquiry page (measured) Redirects elsewhere Sessions starting on each page and the enquiries from them, March to August 2026, from the analytics landing-page report; the two PDFs were found by a crawl. The 9 smallest addresses are left off the chart. Every address with traffic or links is redirected, except those whose page keeps its address: they are left off the redirects map, so nothing redirects to itself, and the workbook refuses loops and chains.
Tollerdine’s current site has been “refreshed” twice by different designers. Nobody had written down what each page was for, so the home page said “quality construction solutions”, the careers page had no way to apply, the tender information sat three clicks deep, and the only form asked eleven questions, including turnover and job title. Before anything is designed, the brief counts what each old page brings in, so the new site starts with every page that earns traffic redirected.
| Page | Purpose (one sentence) | Audience | Goal | Main action | Replaces | |
|---|---|---|---|---|---|---|
| P01 Home / | Shows a private client in seconds what we build and where, and gets them to ask for a price. | All | Enquiries | Request a quotation | Key | / |
| P02 Design and build /design-and-build | Explains to a private client how one contract for design and build works with us, so they ask for a price. | A1 | Enquiries | Request a quotation | Key | /services/design-build |
| P03 Refurbishment and fit-out /refurbishment-and-fit-out | Shows a client with an occupied building how we refurbish around them, so they book a site visit. | A1 | Enquiries | Book a site visit | Key | /services/refurbishment |
| P04 Industrial buildings /sectors/industrial | Shows owners of factories and warehouses the industrial buildings we have built, so they ask for a price. | A1 | Enquiries | Request a quotation | /sectors/industrial | |
| P05 Education and public sector /sectors/education-and-public-sector | Gives a public-sector buyer the frameworks, accreditations and school projects they check during evaluation. | A2 | Credibility for tenders | Download the tender pack | Key | /sectors/education |
| P06 Health and care buildings /sectors/health-and-care | Shows health and care buyers the clinics and care homes we have built. | A2 | Credibility for tenders | Read a case study | New page | |
| P07 Projects /projects | Lets any visitor find a project like theirs by sector, size or town. | All | Credibility for tenders | Read a case study | /our-work | |
| P08 Warehouse extension, Lincoln /projects/warehouse-extension-lincoln | Proves to a private client that we can extend a building while it stays in use. | A1 | Enquiries | Request a quotation | New page | |
| P09 Primary school extension, Sleaford /projects/primary-school-extension-sleaford | Proves to a public-sector buyer that we can build safely on a live school site. | A2 | Credibility for tenders | Download the tender pack | New page | |
| P10 Accreditations and policies /accreditations-and-policies | Puts every certificate and policy a tender asks for in one place to download. | A2 | Credibility for tenders | Download the tender pack | /about/accreditations | |
| P11 About us /about | Tells visitors who runs the business and how long we have built in the county. | All | Supporting | Get in touch | /about | |
| P12 Careers /careers | Shows a site manager, surveyor or apprentice what working here is like, so they apply. | A3 | Recruitment | Apply for a job | Key | /careers |
| P13 Current vacancies /careers/vacancies | Lists every open job with its closing date and a way to apply. | A3 | Recruitment | Apply for a job | /jobs | |
| P14 Apprenticeships /careers/apprenticeships | Shows school leavers and parents how our apprenticeships work. | A3 | Recruitment | Apply for a job | Later | New page |
| P15 Working with us /working-with-us | Tells subcontractors and suppliers how to join our approved list. | A4 | Supporting | Get in touch | /subcontractors | |
| P16 News /news | Keeps a record of finished projects and company news. | All | Supporting | Read a case study | /news | |
| P17 Contact /contact | Gives every visitor the phone number, address and the right person to contact. | All | Enquiries | Call us | Key | /contact-us |
| P18 Privacy notice /privacy | Tells people what we do with the details they send us. | All | Legal | No action: legal page | /privacy-policy | |
| P19 Cookies /cookies | Explains the cookies we use and lets visitors change their choice. | All | Legal | No action: legal page | New page | |
| P20 Accessibility statement /accessibility | Says how accessible the site is and how to report a problem. | All | Legal | No action: legal page | New page | |
| P21 Ask for a price /ask-for-a-price | Holds the short quotation form that every Ask for a price button leads to. | A1 | Enquiries | Request a quotation | New page |
Audiences: A1 private clients commissioning a building; A2 public-sector and framework buyers; A3 job seekers; A4 subcontractors and suppliers. The workbook refuses a purpose that runs to two sentences, and an action that doesn’t serve the page’s goal (a careers page asking for a quotation).
Headline options: “Commercial and public buildings across Lincolnshire, designed and built” · “Your next building, designed and built by one Lincoln contractor”
Button: Ask for a price. Then: The Ask for a price page: a short form; our pre-construction manager replies within two working days. Form: F1. Measured by: Quotation request sent. Written for the search: building contractor Lincolnshire. Proof needed: PF01 (usable); PF04 (usable); PF08 (hold: no evidence on file).
Headline options: “One contract for the design and the build” · “Design and build in Lincolnshire, with one team and one price”
Button: Ask for a price. Then: The Ask for a price page: a short form; our pre-construction manager replies within two working days. Form: F1. Measured by: Quotation request sent. Written for the search: design and build contractor Lincoln. Proof needed: PF06 (usable); PF04 (usable).
Headline options: “Refurbishment and fit-out while you stay open” · “Refurbish your building without closing it”
Button: Book a site visit. Then: Pick a morning or afternoon; a contracts manager confirms by phone within one working day. Form: F2. Measured by: Site visit booking sent. Written for the search: office refurbishment Lincoln. Proof needed: PF05 (usable).
Headline options: “Everything a public-sector buyer checks, in one place” · “Schools, clinics and public buildings across Lincolnshire”
Button: Download the tender pack. Then: A zip of certificates, policies and three case studies downloads straight away, with no form. Form: none. Measured by: Tender pack downloaded. Written for the search: school building contractor Lincolnshire. Proof needed: PF02 (usable); PF03 (usable); PF07 (usable).
Headline options: “Build your career with a Lincoln contractor” · “Site managers, surveyors and apprentices: see what it's like here”
Button: See the vacancies and apply. Then: The vacancies page; each job has its own short application form. Form: F3. Measured by: Application sent. Proof needed: PF09 (usable); PF10 (usable).
Headline options: “Talk to the people who will build it” · “Call us, or tell us about your project”
Button: Call 01632 960418. Then: Rings the office; calls are answered from 8am to 5pm on weekdays. Form: none. Measured by: Phone number tapped. Proof needed: none.
| § | Piece | Text | Proof |
|---|---|---|---|
| 1 | Headline | Commercial and public buildings across Lincolnshire, designed and built | – |
| 1 | Subheading | Design and build, refurbishment and fit-out for businesses, schools and health clients, from our office in Lincoln. | – |
| 1 | Button | Ask for a price | – |
| 2 | Proof line | 140 projects completed across Lincolnshire and the East Midlands since 2011. | PF01 |
| 4 | Body | Tell us what you need. We visit, agree the brief with you and give you one price for the design and the build. One site manager runs it from the first drawing to handover, so you have one person to call throughout. | – |
| 5 | Proof line | In 2025, 17 of our 19 projects were handed over on or before the contract completion date. | PF04 |
| 5 | Proof line | “They kept the warehouse running the whole time they built the extension.” Operations director, food distributor, Lincoln | PF05 |
| 5 | Proof line | Certified to ISO 9001, ISO 14001 and ISO 45001. | PF02 |
| 6 | Body | Send us a few details and our pre-construction manager will reply within two working days. | – |
| 6 | Button | Ask for a price | – |
| § | Piece | Text | Proof |
|---|---|---|---|
| 1 | Headline | One contract for the design and the build | – |
| 1 | Subheading | We design, price and build commercial and industrial buildings across Lincolnshire, so you deal with one team and one price. | – |
| 1 | Button | Ask for a price | – |
| 2 | Body | With separate architects and builders, gaps in the drawings turn into extra costs, and each side blames the other. Under design and build, those gaps are ours to fix, not yours. | – |
| 4 | Proof line | A 2,400 m² warehouse extension in Lincoln, built in 26 weeks while the warehouse stayed open. | PF06 |
| 6 | Button | Ask for a price | – |
| § | Piece | Text | Proof |
|---|---|---|---|
| 1 | Headline | Refurbishment and fit-out while you stay open | – |
| 1 | Subheading | We plan the work around your business, in phases and out of hours where it needs to be, so your staff and customers can carry on. | – |
| 1 | Button | Book a site visit | – |
| 2 | Body | Offices, warehouses, schools and clinics: strip-out, new layouts, mechanical and electrical upgrades and finishes, with one site manager responsible from start to finish. | – |
| 3 | Proof line | “They kept the warehouse running the whole time they built the extension.” Operations director, food distributor, Lincoln | PF05 |
| 6 | Button | Book a site visit | – |
Each line with a figure, or a word like certified, leading or best, links to a proof point with the evidence on file, and states its condition: the on-time figure says “in 2025”, because that is what the records cover. The handover score (4.6 out of 5) stays out until the feedback forms are totalled.
| Form | Fields | Required |
|---|---|---|
| F1 Quotation request Pre-construction manager replies within 2 working days | Name; Email; Phone (optional); Company or organisation (optional); Where the project is (town or postcode); Type of project; What you want built | 5 |
| F2 Site visit booking Contracts manager replies within 1 working day | Name; Email; Phone; Site address; Mornings or afternoons (optional) | 4 |
| F3 Job application Office manager replies within 5 working days | Name; Email; Phone; Job applied for; CV | 5 |
| F4 Supplier registration Commercial manager replies within 10 working days | Company name; Contact name; Email; Trade; Phone (optional) | 4 |
The old quotation form’s eleven questions become five required and two optional; every required field is needed to reply (UK GDPR Article 5(1)(c), data minimisation), the marketing opt-in starts unticked, and the privacy notice is linked at every form. Not legal advice.
| Event | Kind | Form | Where | |
|---|---|---|---|---|
| Quotation form started | Form start | F1 | P21 | |
| Quotation request sent | Form sent | F1 | P21 | Enquiry |
| Site visit form started | Form start | F2 | P03 | |
| Site visit booking sent | Form sent | F2 | P03 | Enquiry |
| Application started | Form start | F3 | P13 | |
| Application sent | Form sent | F3 | P13 | |
| Supplier form started | Form start | F4 | P15 | |
| Supplier registration sent | Form sent | F4 | P15 | |
| Phone number tapped | Call click | – | All pages | |
| Email address clicked | Email click | – | All pages | |
| Tender pack downloaded | Download | – | P05 |
| Area | Requirement | Source |
|---|---|---|
| Accessibility | Every page template and form meets WCAG 2.2 level AA, including the criteria new in 2.2: focus never hidden, targets large enough to tap, no drag-only controls, help in the same place on every page, no re-typing of details already given, log-ins without memory puzzles Checked at handover: An automated scan of each template with no errors, then a keyboard-only and screen-reader check of the home page, a key page and every form; the developer's report handed over | W3C, WCAG 2.2; GOV.UK Service Manual, Understanding WCAG 2.2 |
| Accessibility | An accessibility statement page, saying how accessible the site is and how to report a problem Checked at handover: Page live at launch and linked from the footer | GOV.UK sample accessibility statement (public sector model; asked for in tenders) |
| Page speed | In a lab test on a throttled mid-range mobile profile, the home page and every key page show their main content within 2.5 seconds and shift layout by no more than 0.10. Responding to a tap within 200 milliseconds needs field data from real visits, so it is reviewed at the early read, not at handover Checked at handover: The lab test report for each key page before sign-off (main content and layout shift); the field figure for responsiveness at the early read | Published page-experience thresholds (Inputs; assumed, the client can change them) |
| Page speed | Images resized and compressed on upload; no video that plays on its own Checked at handover: Spot-check five pages after content is loaded | Owner's decision |
| Analytics and tracking | Analytics on every page, with every event on the tracking plan (Developer, part B) set up and named exactly as listed. A form start is the first time a visitor types in or changes any field of a form, counted once a visit; not the page loading or the form coming into view. A form send is a successful submission Checked at handover: Each event fired once in a test and seen in the analytics report before sign-off | This brief (tracking plan) |
| Analytics and tracking | Each enquiry recorded as a conversion with its landing page and where the visit came from; campaign tags carried through to the form and into the email the business receives Checked at handover: A test enquiry from a tagged link shows its source in the report and in the email | This brief (tracking plan) |
| Cookies and consent | No non-essential cookie or similar technology set before the visitor's choice. Analytics only under the statistical-purposes exception (sole purpose, clear information, a free and simple way to object) or with consent; advertising and remarketing tags only with consent Checked at handover: In a fresh browser, no advertising tag fires before consent, and objecting stops analytics | PECR regulation 6 as amended by the Data (Use and Access) Act 2025; ICO, Guidance on the use of storage and access technologies (April 2026) |
| Cookies and consent | The first layer of the banner makes rejecting as easy as accepting; choices can be changed later from every page Checked at handover: Checked on a phone and a desktop | ICO, Guidance on the use of storage and access technologies (managing consent in practice) |
| Privacy notice | A privacy notice linked from every form and the footer: what the forms collect, why, the lawful basis, who receives it, how long it is kept and people's rights. The business supplies the wording Checked at handover: A link on every form; the wording approved by the business, not written by the developer | UK GDPR Article 13; ICO, Right to be informed |
| Forms | Forms ask only for the fields on the Forms sheet; any marketing opt-in is unticked; spam protection that doesn't make people solve puzzles Checked at handover: Each form compared with the Forms sheet; a test sent from each | UK GDPR Article 5(1)(c), data minimisation; PECR; WCAG 2.2 accessible authentication |
| Forms | File uploads (such as CVs, which can contain health or other special category data) are stored encrypted, seen only by named staff and deleted on the schedule the business sets, never kept in a general form inbox; or applications go to a named email address instead Checked at handover: A test upload checked for where it is stored and who can open it | UK GDPR Articles 9 and 32; owner's decision on the route |
| Redirects and search | Every old address on the redirects map sends a permanent (301) redirect to its new page from the moment of launch, with no chains of redirects Checked at handover: Every old address on the map tested on launch day; none shows 'page not found' | This brief (redirects map) |
| Redirects and search | Before the redirects map is finalised, a crawl of the old site lists every address, including PDFs and other documents; every one with traffic or links is added to the map. Pages that keep their address are left off the map and must not redirect to themselves Checked at handover: The crawl list handed over; every address on it either on the map, kept, or marked as having no traffic or links | This brief (redirects map) |
| Redirects and search | Page titles and descriptions for each page from the brief; a new XML sitemap submitted; the live site open to search engines and the test site closed to them Checked at handover: Checked in the search engines' webmaster tools in the first week | This brief (site map) |
| Content management | The quotation states who writes and who loads every page that has no copy draft in this brief (the business, the developer or a copywriter), and the price of each Checked at handover: Every page on the site map live with approved copy before sign-off | Owner's decision |
| Content management | The business can change text and images and add case studies, vacancies and news itself, without the developer; two named staff trained Checked at handover: Two staff each publish a test vacancy and a case study unaided before sign-off | Owner's decision |
| Ownership of domain and accounts | The domain registered in the business's name, with the business holding the registrar log-in; the developer has delegated access only Checked at handover: The registrar account shown at handover in the company's name | Owner's decision |
| Ownership of domain and accounts | The business owns the hosting, analytics and webmaster accounts, every licence for paid themes or plug-ins, and the content, images and code written for it; the developer is a user, not the owner Checked at handover: Administrator log-ins handed over; licences in the business's name | Owner's decision |
| Ownership of domain and accounts | Copyright in the design, code and content made for the business is assigned to it in writing, signed by the developer, on final payment; anything that can't be assigned (third-party code, themes, plug-ins) comes with a perpetual licence the business holds Checked at handover: The signed assignment and the licences handed over before the final payment | Copyright, Designs and Patents Act 1988, section 90(3): an assignment is not effective unless in writing signed by the assignor |
| Ownership of domain and accounts | Licences for every font and image used are in the business's name; photographs of identifiable people have signed releases Checked at handover: The licence list and releases handed over | Owner's decision |
| Privacy notice | Written processor contracts with the developer (while they can see personal data such as form submissions) and the host, with the terms UK GDPR Article 28 requires Checked at handover: Both contracts signed before launch | UK GDPR Article 28(3) |
| Hosting and backup | Exit and export: on request, and at the end of any contract, the developer hands over a full export of the site (content, media, database and code) in a standard format within a stated number of days, for no more than a stated fee Checked at handover: The export terms stated in the quotation; a test export at handover | Owner's decision |
| Hosting and backup | Hosting in the UK or EEA; a daily backup kept off the server for a period the business sets; a restore tested before launch Checked at handover: The restore test shown before sign-off | Owner's decision |
| Security | Security certificate renewing automatically; updates applied at least monthly during the support period Checked at handover: The certificate and update log shown at handover | Owner's decision |
| Handover and support | A fault-fixing (warranty) period after acceptance, at no charge, and the monthly support price after it, both stated in the quotation Checked at handover: In the quotation; faults logged in the period fixed | Owner's decision |
| Handover and support | Payment in stages, with the final stage due only when every check in this brief has passed (acceptance testing) Checked at handover: The payment schedule in the quotation; the final invoice after sign-off | Owner's decision |
Copyright in the design and code is assigned in writing (an assignment isn’t effective otherwise: Copyright, Designs and Patents Act 1988, section 90(3)); the developer and host sign processor contracts (UK GDPR Article 28); the final payment waits for the acceptance tests; and the exit terms say how the business gets its whole site back. WCAG 2.2 level AA is the target the business sets; for a private business no law names it, but public-sector buyers ask. Cookies follow PECR as amended by the Data (Use and Access) Act 2025 and the ICO’s April 2026 guidance: analytics may run under the statistical-purposes exception with clear information and a free way to object; advertising tags need consent. Not legal advice.
| ROI product | What it needs from the brief | Provided by | Status |
|---|---|---|---|
| Landing Page Conversion Plan | Visits and enquiries for each key page from launch day Its own kit asks for: Visits and enquiries by landing page: the analytics landing pages report, with enquiries as a conversion (its SKILL.md) | Tracking plan | Ready once handover checks pass |
| Landing Page Conversion Plan | Ideas to test: the headline options and buttons for each key page Its own kit asks for: Ideas, and where they came from (its SKILL.md) | Headline options and page specs | Ready once handover checks pass |
| SEO Opportunity Plan | Search traffic kept through the rebuild, so the positions it starts from aren't lost Its own kit asks for: Your positions, clicks and the searches you appear for (its SKILL.md) | Redirects map | Ready once handover checks pass |
| SEO Opportunity Plan | Enquiries from search and visits from search, counted the same way Its own kit asks for: Enquiries from search ÷ visits from search, from analytics (its SKILL.md) | Tracking plan | Ready once handover checks pass |
| SEO Opportunity Plan | The technical basics written into the quotation request Its own kit asks for: The technical basics: pages indexed and page speed, from whoever runs the website (its SKILL.md) | Developer requirements | Ready once handover checks pass |
| Local Search and Reviews Plan | Clicks from the business listing land on a contact page with the same name, address and phone number, and calls from the site are tracked Its own kit asks for: Calls, website clicks and direction requests from the business profile's performance figures (its SKILL.md) | Contact page and call tracking | Ready once handover checks pass |
| Ad Spend and Attribution Review | Where every enquiry came from, recorded with it Its own kit asks for: New customers credited to each channel: your shop or CRM, the first order's source (its SKILL.md) Weak fit: The review is built around online orders and the customers each ad platform claims; for a contractor the first order's source has to be carried from the enquiry into the CRM by hand or by the form, so it helps only if that is done | Enquiry source on every form | Ready once handover checks pass (weak fit) |
Main measure, per case: form completion on the Ask for a price page’s form only, 25.8% (61 sent of 236 started, 4 months; give or take 5.7 points); a lift under 28% could be chance, and one of 40% would be seen four times in five, so it can only show direction. A change under 2 standard errors could be chance; what a measure “can show” is judged at 2.8, so a real change that size would be seen four times in five. Even the main measure can only show direction at Tollerdine’s volumes, and the brief says so.
Enquiries per 1,000 sessions on the key enquiry pages: 7.2 (52 quotation requests from 7,200 sessions over 6 months; give or take 2.0); a lift under 48% could be chance, and it would take 73% to be seen four times in five, so direction only; 4% off the enquiry log. Quotation requests only: site-visit bookings, a new form, are counted separately, and spam is taken out by the same weekly review both times. The rate takes out changes in traffic volume; the same months a year apart take out season; the paid share of sessions (8% now) is compared at the re-measure, because a new ad campaign can move the rate without the site.
Launch, early read, re-measure and who pulls the figures: 1 Mar 2027; 30 May 2027; 1 Sep 2027; Office manager. Cost in full: £33,516 in the first year: £31,716 one-off (£4,200 fee; £4,116 team time; £21,000 developer (assumed until a quotation); £2,400 photography (assumed)) and £1,800 a year running costs. Illustration only, if the owner’s target of 10 enquiries per 1,000 sessions is reached (not a forecast): £128,520 a year in gross profit; £64,260 if it moves half as far.
The old site's figures are counted from website analytics: landing-page report, enquiries recorded as conversions (thank-you page) over 6 months; which pages are key, each page's purpose and main action, the wireframes and the copy are the team's judgement, checked for one purpose and one action per page, an action that serves the page's goal, a complete wireframe and copy that rests on proof on file. The automatic checks catch figures and words like best, only, leading and certified, not every claim, so read the copy against the proof register. Data minimisation, PECR and the privacy notice are judged against UK GDPR and the ICO's guidance (not legal advice); WCAG 2.2 AA and the page-speed thresholds are targets the client sets, labelled as such. The value case is Unlocks: it names what the catalogue products need from the brief, and each is ready only once the handover checks pass; it is not a forecast of enquiries. What a measure can show is judged at 2.8 standard errors (a real change of that size seen four times in five); a change under 2 standard errors could be chance. Form completion is counted from 236 form starts on one page's form; the realistic lift (30%) is assumed. Enquiries per 1,000 sessions rest on 52 quotation requests, so they can only show direction; the target is the owner's assumption, so any £ figure is an illustration. Costs without a quotation (developer, running costs, photography) are assumed until one is in hand.
The brief is finished when it goes out for quotations. Compare each quotation against the developer requirements line by line, and keep the brief as the acceptance test at handover.