Website Brief · October 2026

Tollerdine Construction Ltd

Regional building contractor: design and build, refurbishment and fit-out for commercial, industrial, education and health clients across Lincolnshire and the East Midlands, from an office in Lincoln. 78 staff.

Worked example. Tollerdine Construction and its figures are fictional. All figures come from the worked-example spreadsheet: ALL CHECKS PASSED (with 6 notes).
The headline

A brief the developers can quote against: 20 pages, each with one job

Pages at launch
20
each with one purpose, one audience and one main action that serves its goal
Key pages specified
6
headline options, button, form, event, proof and a wireframe in words
Old addresses redirected
17 of 17
every address with traffic or links, PDFs included; 5 more keep their address
Requirements for the quotation
26
each with how it is checked at handover; 9 of 9 areas covered

Verdict: The brief specifies 20 pages at launch, each with one purpose and one main action that serves its goal; 6 key pages have a complete spec and wireframe. All 17 old addresses with traffic or links redirect to a page live at launch; 5 keep their address and are left off the redirects map. Copy is drafted for 3 pages, every claim on usable proof; 1 proof point is on hold and kept out of the copy. Every required form field is needed to reply. 26 developer requirements are ready for the quotation request, covering every area needed. It feeds 4 catalogue ROI products: 7 of 7 needs are ready once the handover checks pass; 1 is a weak fit. Main measure: form completion on the quotation page, 26% now, can only show direction by the re-measure; enquiries per 1,000 sessions on the key enquiry pages, 7.2 now, can only show direction. Measure again on 1 Sep 2027 (early read 30 May 2027).

The old site

23 addresses; 13,129 sessions and 64 enquiries; 5 keep their address; 17 need a redirect (traffic or links); 0 missing

/3,940 · 21 enq. kept: same address/careers1,350 · 0 enq. kept: same address/services/design-build1,120 · 9 enq. → P02 Design and build/services/refurbishment980 · 11 enq. → P03 Refurbishment and fit-out/our-work760 · 3 enq. → P07 Projects/jobs690 · 0 enq. → P13 Current vacancies/sectors/industrial620 · 5 enq. kept: same address/sectors/education540 · 2 enq. → P05 Education and public sector/contact-us520 · 6 enq. → P17 Contact/about480 · 1 enq. kept: same address/services/extensions410 · 4 enq. → P02 Design and build/about/accreditations350 · 0 enq. → P10 Accreditations and policies/news300 · 0 enq. kept: same address/sectors/commercial230 · 1 enq. → P02 Design and build

Redirects to a key enquiry page (measured) Redirects elsewhere Sessions starting on each page and the enquiries from them, March to August 2026, from the analytics landing-page report; the two PDFs were found by a crawl. The 9 smallest addresses are left off the chart. Every address with traffic or links is redirected, except those whose page keeps its address: they are left off the redirects map, so nothing redirects to itself, and the workbook refuses loops and chains.

Tollerdine’s current site has been “refreshed” twice by different designers. Nobody had written down what each page was for, so the home page said “quality construction solutions”, the careers page had no way to apply, the tender information sat three clicks deep, and the only form asked eleven questions, including turnover and job title. Before anything is designed, the brief counts what each old page brings in, so the new site starts with every page that earns traffic redirected.

The site map

Every page, its one purpose and the one thing it asks the visitor to do

PagePurpose (one sentence)AudienceGoalMain actionReplaces
P01 Home
/
Shows a private client in seconds what we build and where, and gets them to ask for a price.AllEnquiriesRequest a quotationKey /
P02 Design and build
/design-and-build
Explains to a private client how one contract for design and build works with us, so they ask for a price.A1EnquiriesRequest a quotationKey /services/design-build
P03 Refurbishment and fit-out
/refurbishment-and-fit-out
Shows a client with an occupied building how we refurbish around them, so they book a site visit.A1EnquiriesBook a site visitKey /services/refurbishment
P04 Industrial buildings
/sectors/industrial
Shows owners of factories and warehouses the industrial buildings we have built, so they ask for a price.A1EnquiriesRequest a quotation/sectors/industrial
P05 Education and public sector
/sectors/education-and-public-sector
Gives a public-sector buyer the frameworks, accreditations and school projects they check during evaluation.A2Credibility for tendersDownload the tender packKey /sectors/education
P06 Health and care buildings
/sectors/health-and-care
Shows health and care buyers the clinics and care homes we have built.A2Credibility for tendersRead a case studyNew page
P07 Projects
/projects
Lets any visitor find a project like theirs by sector, size or town.AllCredibility for tendersRead a case study/our-work
P08 Warehouse extension, Lincoln
/projects/warehouse-extension-lincoln
Proves to a private client that we can extend a building while it stays in use.A1EnquiriesRequest a quotationNew page
P09 Primary school extension, Sleaford
/projects/primary-school-extension-sleaford
Proves to a public-sector buyer that we can build safely on a live school site.A2Credibility for tendersDownload the tender packNew page
P10 Accreditations and policies
/accreditations-and-policies
Puts every certificate and policy a tender asks for in one place to download.A2Credibility for tendersDownload the tender pack/about/accreditations
P11 About us
/about
Tells visitors who runs the business and how long we have built in the county.AllSupportingGet in touch/about
P12 Careers
/careers
Shows a site manager, surveyor or apprentice what working here is like, so they apply.A3RecruitmentApply for a jobKey /careers
P13 Current vacancies
/careers/vacancies
Lists every open job with its closing date and a way to apply.A3RecruitmentApply for a job/jobs
P14 Apprenticeships
/careers/apprenticeships
Shows school leavers and parents how our apprenticeships work.A3RecruitmentApply for a jobLaterNew page
P15 Working with us
/working-with-us
Tells subcontractors and suppliers how to join our approved list.A4SupportingGet in touch/subcontractors
P16 News
/news
Keeps a record of finished projects and company news.AllSupportingRead a case study/news
P17 Contact
/contact
Gives every visitor the phone number, address and the right person to contact.AllEnquiriesCall usKey /contact-us
P18 Privacy notice
/privacy
Tells people what we do with the details they send us.AllLegalNo action: legal page/privacy-policy
P19 Cookies
/cookies
Explains the cookies we use and lets visitors change their choice.AllLegalNo action: legal pageNew page
P20 Accessibility statement
/accessibility
Says how accessible the site is and how to report a problem.AllLegalNo action: legal pageNew page
P21 Ask for a price
/ask-for-a-price
Holds the short quotation form that every Ask for a price button leads to.A1EnquiriesRequest a quotationNew page

Audiences: A1 private clients commissioning a building; A2 public-sector and framework buyers; A3 job seekers; A4 subcontractors and suppliers. The workbook refuses a purpose that runs to two sentences, and an action that doesn’t serve the page’s goal (a careers page asking for a quotation).

Key pages

What each key page must do, and its wireframe in words

P01 · Home

Headline options: “Commercial and public buildings across Lincolnshire, designed and built” · “Your next building, designed and built by one Lincoln contractor”

Button: Ask for a price. Then: The Ask for a price page: a short form; our pre-construction manager replies within two working days. Form: F1. Measured by: Quotation request sent. Written for the search: building contractor Lincolnshire. Proof needed: PF01 (usable); PF04 (usable); PF08 (hold: no evidence on file).

  1. Opening screen (hero): Headline; one line on what we build and where; the Ask for a price button; the phone number; a photo of a finished building, not people in hard hats
  2. Recent projects (proof, proof PF01): Three recent projects, each with a photo, the sector, the town and the value band, linking to its case study
  3. What we build (what we do): Three blocks: design and build; refurbishment and fit-out; education and public sector, each one line and a link
  4. From first visit to handover (how it works): Four steps: we visit and agree the brief; a fixed price for design and build; one site manager runs it; handover and the defects period
  5. Why clients come back (proof, proof PF04): The on-time figure for 2025; one client testimonial; the certificates strip
  6. Ask for a price (call to action): What happens next in one sentence; the button; the phone number for those who'd rather call

P02 · Design and build

Headline options: “One contract for the design and the build” · “Design and build in Lincolnshire, with one team and one price”

Button: Ask for a price. Then: The Ask for a price page: a short form; our pre-construction manager replies within two working days. Form: F1. Measured by: Quotation request sent. Written for the search: design and build contractor Lincoln. Proof needed: PF06 (usable); PF04 (usable).

  1. Opening screen (hero): Headline; one line on one team and one price; the Ask for a price button
  2. Why split contracts cost more (problem): The gaps between architect and builder, in the client's words; one sentence on why those gaps are ours under design and build
  3. The five stages (how it works): Feasibility, design, fixed price, build, handover: what the client decides at each, and roughly how long each takes
  4. A project like yours (proof, proof PF06): The Lincoln warehouse extension case study, with a photo and the client's testimonial
  5. Questions clients ask (faq): What it costs to start; who owns the design; planning permission; what if the brief changes
  6. Ask for a price (call to action): What happens next; the button; the phone number

P03 · Refurbishment and fit-out

Headline options: “Refurbishment and fit-out while you stay open” · “Refurbish your building without closing it”

Button: Book a site visit. Then: Pick a morning or afternoon; a contracts manager confirms by phone within one working day. Form: F2. Measured by: Site visit booking sent. Written for the search: office refurbishment Lincoln. Proof needed: PF05 (usable).

  1. Opening screen (hero): Headline; one line on working around the client's business; the Book a site visit button
  2. What we refurbish (what we do): Offices, warehouses, schools and clinics: strip-out, new layouts, mechanical and electrical upgrades, finishes
  3. Open throughout (proof, proof PF05): One client testimonial about staying open during the work
  4. Working in an occupied building (how it works): Phasing, out-of-hours work, dust and noise control, keeping fire exits and access clear
  5. Questions clients ask (faq): Can we stay open; how long it takes; who manages the site; what a site visit involves
  6. Book a site visit (call to action): What happens at the visit; the button; the phone number

P05 · Education and public sector

Headline options: “Everything a public-sector buyer checks, in one place” · “Schools, clinics and public buildings across Lincolnshire”

Button: Download the tender pack. Then: A zip of certificates, policies and three case studies downloads straight away, with no form. Form: none. Measured by: Tender pack downloaded. Written for the search: school building contractor Lincolnshire. Proof needed: PF02 (usable); PF03 (usable); PF07 (usable).

  1. Opening screen (hero): Headline; the frameworks we are on; the Download the tender pack button
  2. Frameworks and accreditations (proof, proof PF03): The framework place with its lot and dates; the ISO certificates; links to each policy as a PDF
  3. School and public projects (proof, proof PF07): Three case studies, each with the value, the programme and how the site was kept safe
  4. Working on live sites (what we do): Safeguarding, site separation, deliveries outside school runs, and how we brief staff and parents
  5. Download the tender pack (call to action): The button; the bid manager's name and phone number for questions during a tender

P12 · Careers

Headline options: “Build your career with a Lincoln contractor” · “Site managers, surveyors and apprentices: see what it's like here”

Button: See the vacancies and apply. Then: The vacancies page; each job has its own short application form. Form: F3. Measured by: Application sent. Proof needed: PF09 (usable); PF10 (usable).

  1. Opening screen (hero): Headline; a photo of one of our own site teams; the See the vacancies button
  2. What it's like here (what we do): Projects you'd work on; training and qualifications we pay for; how people progress
  3. People who started here (proof, proof PF10): A staff testimonial from a former apprentice; the apprentices-retained figure
  4. See the vacancies and apply (call to action): The button; how applications are handled and how long a reply takes

P17 · Contact

Headline options: “Talk to the people who will build it” · “Call us, or tell us about your project”

Button: Call 01632 960418. Then: Rings the office; calls are answered from 8am to 5pm on weekdays. Form: none. Measured by: Phone number tapped. Proof needed: none.

  1. Opening screen (hero): Headline; the office phone number, large and tappable; opening hours
  2. Call or ask for a price (call to action): The phone number again; a link to the Ask for a price page for those who'd rather write
  3. Where we are (other): Office address, a map, parking, and the same name, address and phone number as the business listing
  4. Who to contact for what (other): Estimating, careers, supply chain and accounts, each with a named role and email address
Copy drafts

The home page and two key pages, every claim on proof

P01 · Home

§PieceTextProof
1HeadlineCommercial and public buildings across Lincolnshire, designed and built–
1SubheadingDesign and build, refurbishment and fit-out for businesses, schools and health clients, from our office in Lincoln.–
1ButtonAsk for a price–
2Proof line140 projects completed across Lincolnshire and the East Midlands since 2011.PF01
4BodyTell us what you need. We visit, agree the brief with you and give you one price for the design and the build. One site manager runs it from the first drawing to handover, so you have one person to call throughout.–
5Proof lineIn 2025, 17 of our 19 projects were handed over on or before the contract completion date.PF04
5Proof line“They kept the warehouse running the whole time they built the extension.” Operations director, food distributor, LincolnPF05
5Proof lineCertified to ISO 9001, ISO 14001 and ISO 45001.PF02
6BodySend us a few details and our pre-construction manager will reply within two working days.–
6ButtonAsk for a price–

P02 · Design and build

§PieceTextProof
1HeadlineOne contract for the design and the build–
1SubheadingWe design, price and build commercial and industrial buildings across Lincolnshire, so you deal with one team and one price.–
1ButtonAsk for a price–
2BodyWith separate architects and builders, gaps in the drawings turn into extra costs, and each side blames the other. Under design and build, those gaps are ours to fix, not yours.–
4Proof lineA 2,400 m² warehouse extension in Lincoln, built in 26 weeks while the warehouse stayed open.PF06
6ButtonAsk for a price–

P03 · Refurbishment and fit-out

§PieceTextProof
1HeadlineRefurbishment and fit-out while you stay open–
1SubheadingWe plan the work around your business, in phases and out of hours where it needs to be, so your staff and customers can carry on.–
1ButtonBook a site visit–
2BodyOffices, warehouses, schools and clinics: strip-out, new layouts, mechanical and electrical upgrades and finishes, with one site manager responsible from start to finish.–
3Proof line“They kept the warehouse running the whole time they built the extension.” Operations director, food distributor, LincolnPF05
6ButtonBook a site visit–

Each line with a figure, or a word like certified, leading or best, links to a proof point with the evidence on file, and states its condition: the on-time figure says “in 2025”, because that is what the records cover. The handover score (4.6 out of 5) stays out until the feedback forms are totalled.

Forms

Only what is needed to reply

FormFieldsRequired
F1 Quotation request
Pre-construction manager replies within 2 working days
Name; Email; Phone (optional); Company or organisation (optional); Where the project is (town or postcode); Type of project; What you want built5
F2 Site visit booking
Contracts manager replies within 1 working day
Name; Email; Phone; Site address; Mornings or afternoons (optional)4
F3 Job application
Office manager replies within 5 working days
Name; Email; Phone; Job applied for; CV5
F4 Supplier registration
Commercial manager replies within 10 working days
Company name; Contact name; Email; Trade; Phone (optional)4

The old quotation form’s eleven questions become five required and two optional; every required field is needed to reply (UK GDPR Article 5(1)(c), data minimisation), the marketing opt-in starts unticked, and the privacy notice is linked at every form. Not legal advice.

Tracking plan

Every event named, so the developer sets up exactly these

EventKindFormWhere
Quotation form startedForm startF1P21
Quotation request sentForm sentF1P21Enquiry
Site visit form startedForm startF2P03
Site visit booking sentForm sentF2P03Enquiry
Application startedForm startF3P13
Application sentForm sentF3P13
Supplier form startedForm startF4P15
Supplier registration sentForm sentF4P15
Phone number tappedCall click–All pages
Email address clickedEmail click–All pages
Tender pack downloadedDownload–P05
For the quotation request

26 requirements, each with how it is checked at handover; 9 of 9 needed areas covered

AreaRequirementSource
AccessibilityEvery page template and form meets WCAG 2.2 level AA, including the criteria new in 2.2: focus never hidden, targets large enough to tap, no drag-only controls, help in the same place on every page, no re-typing of details already given, log-ins without memory puzzles
Checked at handover: An automated scan of each template with no errors, then a keyboard-only and screen-reader check of the home page, a key page and every form; the developer's report handed over
W3C, WCAG 2.2; GOV.UK Service Manual, Understanding WCAG 2.2
AccessibilityAn accessibility statement page, saying how accessible the site is and how to report a problem
Checked at handover: Page live at launch and linked from the footer
GOV.UK sample accessibility statement (public sector model; asked for in tenders)
Page speedIn a lab test on a throttled mid-range mobile profile, the home page and every key page show their main content within 2.5 seconds and shift layout by no more than 0.10. Responding to a tap within 200 milliseconds needs field data from real visits, so it is reviewed at the early read, not at handover
Checked at handover: The lab test report for each key page before sign-off (main content and layout shift); the field figure for responsiveness at the early read
Published page-experience thresholds (Inputs; assumed, the client can change them)
Page speedImages resized and compressed on upload; no video that plays on its own
Checked at handover: Spot-check five pages after content is loaded
Owner's decision
Analytics and trackingAnalytics on every page, with every event on the tracking plan (Developer, part B) set up and named exactly as listed. A form start is the first time a visitor types in or changes any field of a form, counted once a visit; not the page loading or the form coming into view. A form send is a successful submission
Checked at handover: Each event fired once in a test and seen in the analytics report before sign-off
This brief (tracking plan)
Analytics and trackingEach enquiry recorded as a conversion with its landing page and where the visit came from; campaign tags carried through to the form and into the email the business receives
Checked at handover: A test enquiry from a tagged link shows its source in the report and in the email
This brief (tracking plan)
Cookies and consentNo non-essential cookie or similar technology set before the visitor's choice. Analytics only under the statistical-purposes exception (sole purpose, clear information, a free and simple way to object) or with consent; advertising and remarketing tags only with consent
Checked at handover: In a fresh browser, no advertising tag fires before consent, and objecting stops analytics
PECR regulation 6 as amended by the Data (Use and Access) Act 2025; ICO, Guidance on the use of storage and access technologies (April 2026)
Cookies and consentThe first layer of the banner makes rejecting as easy as accepting; choices can be changed later from every page
Checked at handover: Checked on a phone and a desktop
ICO, Guidance on the use of storage and access technologies (managing consent in practice)
Privacy noticeA privacy notice linked from every form and the footer: what the forms collect, why, the lawful basis, who receives it, how long it is kept and people's rights. The business supplies the wording
Checked at handover: A link on every form; the wording approved by the business, not written by the developer
UK GDPR Article 13; ICO, Right to be informed
FormsForms ask only for the fields on the Forms sheet; any marketing opt-in is unticked; spam protection that doesn't make people solve puzzles
Checked at handover: Each form compared with the Forms sheet; a test sent from each
UK GDPR Article 5(1)(c), data minimisation; PECR; WCAG 2.2 accessible authentication
FormsFile uploads (such as CVs, which can contain health or other special category data) are stored encrypted, seen only by named staff and deleted on the schedule the business sets, never kept in a general form inbox; or applications go to a named email address instead
Checked at handover: A test upload checked for where it is stored and who can open it
UK GDPR Articles 9 and 32; owner's decision on the route
Redirects and searchEvery old address on the redirects map sends a permanent (301) redirect to its new page from the moment of launch, with no chains of redirects
Checked at handover: Every old address on the map tested on launch day; none shows 'page not found'
This brief (redirects map)
Redirects and searchBefore the redirects map is finalised, a crawl of the old site lists every address, including PDFs and other documents; every one with traffic or links is added to the map. Pages that keep their address are left off the map and must not redirect to themselves
Checked at handover: The crawl list handed over; every address on it either on the map, kept, or marked as having no traffic or links
This brief (redirects map)
Redirects and searchPage titles and descriptions for each page from the brief; a new XML sitemap submitted; the live site open to search engines and the test site closed to them
Checked at handover: Checked in the search engines' webmaster tools in the first week
This brief (site map)
Content managementThe quotation states who writes and who loads every page that has no copy draft in this brief (the business, the developer or a copywriter), and the price of each
Checked at handover: Every page on the site map live with approved copy before sign-off
Owner's decision
Content managementThe business can change text and images and add case studies, vacancies and news itself, without the developer; two named staff trained
Checked at handover: Two staff each publish a test vacancy and a case study unaided before sign-off
Owner's decision
Ownership of domain and accountsThe domain registered in the business's name, with the business holding the registrar log-in; the developer has delegated access only
Checked at handover: The registrar account shown at handover in the company's name
Owner's decision
Ownership of domain and accountsThe business owns the hosting, analytics and webmaster accounts, every licence for paid themes or plug-ins, and the content, images and code written for it; the developer is a user, not the owner
Checked at handover: Administrator log-ins handed over; licences in the business's name
Owner's decision
Ownership of domain and accountsCopyright in the design, code and content made for the business is assigned to it in writing, signed by the developer, on final payment; anything that can't be assigned (third-party code, themes, plug-ins) comes with a perpetual licence the business holds
Checked at handover: The signed assignment and the licences handed over before the final payment
Copyright, Designs and Patents Act 1988, section 90(3): an assignment is not effective unless in writing signed by the assignor
Ownership of domain and accountsLicences for every font and image used are in the business's name; photographs of identifiable people have signed releases
Checked at handover: The licence list and releases handed over
Owner's decision
Privacy noticeWritten processor contracts with the developer (while they can see personal data such as form submissions) and the host, with the terms UK GDPR Article 28 requires
Checked at handover: Both contracts signed before launch
UK GDPR Article 28(3)
Hosting and backupExit and export: on request, and at the end of any contract, the developer hands over a full export of the site (content, media, database and code) in a standard format within a stated number of days, for no more than a stated fee
Checked at handover: The export terms stated in the quotation; a test export at handover
Owner's decision
Hosting and backupHosting in the UK or EEA; a daily backup kept off the server for a period the business sets; a restore tested before launch
Checked at handover: The restore test shown before sign-off
Owner's decision
SecuritySecurity certificate renewing automatically; updates applied at least monthly during the support period
Checked at handover: The certificate and update log shown at handover
Owner's decision
Handover and supportA fault-fixing (warranty) period after acceptance, at no charge, and the monthly support price after it, both stated in the quotation
Checked at handover: In the quotation; faults logged in the period fixed
Owner's decision
Handover and supportPayment in stages, with the final stage due only when every check in this brief has passed (acceptance testing)
Checked at handover: The payment schedule in the quotation; the final invoice after sign-off
Owner's decision

Copyright in the design and code is assigned in writing (an assignment isn’t effective otherwise: Copyright, Designs and Patents Act 1988, section 90(3)); the developer and host sign processor contracts (UK GDPR Article 28); the final payment waits for the acceptance tests; and the exit terms say how the business gets its whole site back. WCAG 2.2 level AA is the target the business sets; for a private business no law names it, but public-sector buyers ask. Cookies follow PECR as amended by the Data (Use and Access) Act 2025 and the ICO’s April 2026 guidance: analytics may run under the statistical-purposes exception with clear information and a free way to object; advertising tags need consent. Not legal advice.

How the value is shown

Unlocks: the catalogue products this brief feeds, ready once the handover checks pass

ROI productWhat it needs from the briefProvided byStatus
Landing Page Conversion PlanVisits and enquiries for each key page from launch day
Its own kit asks for: Visits and enquiries by landing page: the analytics landing pages report, with enquiries as a conversion (its SKILL.md)
Tracking planReady once handover checks pass
Landing Page Conversion PlanIdeas to test: the headline options and buttons for each key page
Its own kit asks for: Ideas, and where they came from (its SKILL.md)
Headline options and page specsReady once handover checks pass
SEO Opportunity PlanSearch traffic kept through the rebuild, so the positions it starts from aren't lost
Its own kit asks for: Your positions, clicks and the searches you appear for (its SKILL.md)
Redirects mapReady once handover checks pass
SEO Opportunity PlanEnquiries from search and visits from search, counted the same way
Its own kit asks for: Enquiries from search ÷ visits from search, from analytics (its SKILL.md)
Tracking planReady once handover checks pass
SEO Opportunity PlanThe technical basics written into the quotation request
Its own kit asks for: The technical basics: pages indexed and page speed, from whoever runs the website (its SKILL.md)
Developer requirementsReady once handover checks pass
Local Search and Reviews PlanClicks from the business listing land on a contact page with the same name, address and phone number, and calls from the site are tracked
Its own kit asks for: Calls, website clicks and direction requests from the business profile's performance figures (its SKILL.md)
Contact page and call trackingReady once handover checks pass
Ad Spend and Attribution ReviewWhere every enquiry came from, recorded with it
Its own kit asks for: New customers credited to each channel: your shop or CRM, the first order's source (its SKILL.md)
Weak fit: The review is built around online orders and the customers each ad platform claims; for a contractor the first order's source has to be carried from the enquiry into the CRM by hand or by the form, so it helps only if that is done
Enquiry source on every formReady once handover checks pass (weak fit)
Measure later

Form completion is the main measure; enquiries per 1,000 sessions show direction only

Main measure, per case: form completion on the Ask for a price page’s form only, 25.8% (61 sent of 236 started, 4 months; give or take 5.7 points); a lift under 28% could be chance, and one of 40% would be seen four times in five, so it can only show direction. A change under 2 standard errors could be chance; what a measure “can show” is judged at 2.8, so a real change that size would be seen four times in five. Even the main measure can only show direction at Tollerdine’s volumes, and the brief says so.

Enquiries per 1,000 sessions on the key enquiry pages: 7.2 (52 quotation requests from 7,200 sessions over 6 months; give or take 2.0); a lift under 48% could be chance, and it would take 73% to be seen four times in five, so direction only; 4% off the enquiry log. Quotation requests only: site-visit bookings, a new form, are counted separately, and spam is taken out by the same weekly review both times. The rate takes out changes in traffic volume; the same months a year apart take out season; the paid share of sessions (8% now) is compared at the re-measure, because a new ad campaign can move the rate without the site.

Launch, early read, re-measure and who pulls the figures: 1 Mar 2027; 30 May 2027; 1 Sep 2027; Office manager. Cost in full: £33,516 in the first year: £31,716 one-off (£4,200 fee; £4,116 team time; £21,000 developer (assumed until a quotation); £2,400 photography (assumed)) and £1,800 a year running costs. Illustration only, if the owner’s target of 10 enquiries per 1,000 sessions is reached (not a forecast): £128,520 a year in gross profit; £64,260 if it moves half as far.

How confident are we?

What this rests on

The old site's figures are counted from website analytics: landing-page report, enquiries recorded as conversions (thank-you page) over 6 months; which pages are key, each page's purpose and main action, the wireframes and the copy are the team's judgement, checked for one purpose and one action per page, an action that serves the page's goal, a complete wireframe and copy that rests on proof on file. The automatic checks catch figures and words like best, only, leading and certified, not every claim, so read the copy against the proof register. Data minimisation, PECR and the privacy notice are judged against UK GDPR and the ICO's guidance (not legal advice); WCAG 2.2 AA and the page-speed thresholds are targets the client sets, labelled as such. The value case is Unlocks: it names what the catalogue products need from the brief, and each is ready only once the handover checks pass; it is not a forecast of enquiries. What a measure can show is judged at 2.8 standard errors (a real change of that size seen four times in five); a change under 2 standard errors could be chance. Form completion is counted from 236 form starts on one page's form; the realistic lift (30%) is assumed. Enquiries per 1,000 sessions rest on 52 quotation requests, so they can only show direction; the target is the owner's assumption, so any £ figure is an illustration. Costs without a quotation (developer, running costs, photography) are assumed until one is in hand.

The brief is finished when it goes out for quotations. Compare each quotation against the developer requirements line by line, and keep the brief as the acceptance test at handover.